Remeo Oy, Waste processing plant, Vantaa
The new recycling plant in Vantaa will significantly contribute to the circular economy in Finland.
%20-%20rajattu-min.jpg)
The new plant will replace mechanical material handling with a new learning technology that will allow a significantly higher proportion of the material to be recycled. The main objective is to increase the recycling rate of waste materials generated in the metropolitan area. The future annual treatment capacity of the plant will be 120 000 tonnes of construction waste and 60 000 tonnes of energy from commercial and industrial waste. The investment increases the recycling rate in Finland and eliminates the need to export construction waste abroad.
Customer
Remeo Oy
Location
Vantaa
Completion
2021
Services
Structural engineering
Other references
-
Pirtti Primary School, Kuopio
A new school is being built in the Pirtin district of Kuopio for approximately 800 primary school pupils and preschoolers.
-
Finvector, GMP5 pharmaceutical factory, Kuopio
FinVector's new pharmaceutical factory for cell and gene therapy drugs was completed in Technopolis, Kuopio.
-
Vaasan Sähkö Oy, Pått Heat pump plant, Vaasa
A heat pump plant was completed at the Pått wastewater treatment plant near the center of Vaasa, where waste heat from the treated wastewater is recovered and transferred to the district heating network.
-
Metsä Fibre, Rauma sawmill, Rauma
Metsä Fibre's Rauma sawmill is Finland's largest sawmill investment to date, and a world leader in terms of technology and efficiency.