Finvector, GMP5 pharmaceutical factory, Kuopio
FinVector's new pharmaceutical factory for cell and gene therapy drugs was completed in Technopolis, Kuopio.

The new clean room for cancer drug manufacturing was technically demanding to design and build, especially to ensure the tightness of the rooms, which required strong engineering expertise. Maintenance of the space, such as temperature, humidity and air pressure control, must be maintained throughout the building life cycle. The cleanroom was implemented using the EPCM (Engineering, Procurement and Construction Management) model, in collaboration with Elomatic.
Customer
FinVector
Location
Kuopio
Size
20250 m²
Completion
2024
Services
Supervision
Geotechnical engineering
Moisture control
Structural engineering
Building information modelling (BIM)
Acoustical engineering
Other references
-
Pirtti Primary School, Kuopio
A new school is being built in the Pirtin district of Kuopio for approximately 800 primary school pupils and preschoolers.
-
Vaasan Sähkö Oy, Pått Heat pump plant, Vaasa
A heat pump plant was completed at the Pått wastewater treatment plant near the center of Vaasa, where waste heat from the treated wastewater is recovered and transferred to the district heating network.
-
Metsä Fibre, Rauma sawmill, Rauma
Metsä Fibre's Rauma sawmill is Finland's largest sawmill investment to date, and a world leader in terms of technology and efficiency.
-
Apetit, renewable energy production and waste heat recovery, Säkylä
Apetit Säkylä plant uses biogas and waste heat from food production, which reduces the carbon footprint of the plant's energy procurement by 80%, more than 4,000 tonnes per year.