The F3 project of Outokumpu’s ferrochrome plant was the world’s largest ferrochrome smelting plant and the steel plant with the most integrated operations upon its opening in 2013.

The factory area houses the ferrochrome plant, smelting plant, and mills for hot and cold rolling processes. With an extension project, the factory doubled its ferrochrome production to 530,000 tonnes by 2015. In total, 12,000 tonnes of steel structures were required, half of which were used for the smelting plant’s frame. The project used about 70,000 cubic metres of concrete.
Customer
Outokumpu Oyj
Location
Tornio
Size
42 320 m²
Completion
2013
Services
HVAC and building automation
Structural engineering
-
Keilaniemi Tower, Espoo
Espoon Keilaniemeen nousee korkea hybriditalo, jossa on 34 maanpäällistä kerrosta ja neljä maanalaista kellarikerrosta.
-
Finvector, GMP5 Lääketehdas, Kuopio
Solu- ja geeniterapialääkkeitä valmistavan FinVector Oy:n uusi lääketehdas sijaitsee Kuopion Savilahdelle.
-
Vaasan Sähkö Oy, Pått Lämpöpumppulaitos, Vaasa
Vaasan keskustan läheisyydessä sijaitsevan Påttin jätevedenpuhdistamon yhteyteen on valmistunut lämpöpumppulaitos, jossa puhdistetun jäteveden sisältämä hukkalämpö otetaan talteen ja siirretään kaukolämpöverkkoon.
-
Metsä Fibre, Rauman Saha, Rauma
Metsä Fibre Rauman mäntysaha on Suomen tähän mennessä suurin sahainvestointi, ja teknologialtaan ja tehokkuudeltaan edelläkävijä maailmassa.