Outokumpu Oyj, F3 extension of the ferrochrome plant, Tornio

The F3 project of Outokumpu’s ferrochrome plant was the world’s largest ferrochrome smelting plant and the steel plant with the most integrated operations upon its opening in 2013.

Outokumpu Oyj, F3 extension of the ferrochrome plant, Tornio

The factory area houses the ferrochrome plant, smelting plant, and mills for hot and cold rolling processes. With an extension project, the factory doubled its ferrochrome production to 530,000 tonnes by 2015. In total, 12,000 tonnes of steel structures were required, half of which were used for the smelting plant’s frame. The project used about 70,000 cubic metres of concrete.

Customer
Outokumpu Oyj

Location
Tornio

Size
42 320 m²

Completion
2013

Services
HVAC and building automation
Structural engineering

  • Keilaniemi-aukionäkymä_web

    Keilaniemi Tower, Espoo

    Espoon Keilaniemeen nousee korkea hybriditalo, jossa on 34 maanpäällistä kerrosta ja neljä maanalaista kellarikerrosta.

  • finvector uusi laaketehdas kuopio 1920

    Finvector, GMP5 Lääketehdas, Kuopio

    Solu- ja geeniterapialääkkeitä valmistavan FinVector Oy:n uusi lääketehdas sijaitsee Kuopion Savilahdelle.

  • Påttin_lämpöpumppulaitos_WEB2

    Vaasan Sähkö Oy, Pått Lämpöpumppulaitos, Vaasa

    Vaasan keskustan läheisyydessä sijaitsevan Påttin jätevedenpuhdistamon yhteyteen on valmistunut lämpöpumppulaitos, jossa puhdistetun jäteveden sisältämä hukkalämpö otetaan talteen ja siirretään kaukolämpöverkkoon.

  • Metsä Fibre, Rauman Saha, Rauma

    Metsä Fibre Rauman mäntysaha on Suomen tähän mennessä suurin sahainvestointi, ja teknologialtaan ja tehokkuudeltaan edelläkävijä maailmassa.