The project will improve the smoothness of main roads and road safety to the level required by the highway network.

Improving Highway 3 and Highway 18 at Laihia

Building design has made extensive use of data modelling, including coordination, simulatability and illustration of plans to performers. Bottom reinforcements were made for the entire highway period. The design was done entirely by modelling. Construction and subscriber inspection activities were also done using models.

Customer
Väylävirasto

Location
Laihia

Size
9 km

Completion
2020

Services
Road planning
Rock engineering