Improvement of highway 4 between Vehniä - Äänekoski
The goal of upgrading Highway 4 has been to improve road safety for the connection and to provide for the future needs of traffic by building Highway 4 into a four-lane and semi-central railing.
The sizable parallel road arrangements for the entire stretch of highway to a predominantly new location. One new intersection for Hirvaskylä. The share will be linked to four interchanges in the future. Measuring noise control measures, approximately 7 km on a section of noise control structures.
Customer
Keski-Suomen ELY-keskus
Location
Äänekoski
Size
14,6 km
Completion
2022
Services
Road planning
Rock engineering
Other references
-
Laakso Joint Hospital, Helsinki
Laakso Joint Hospital is a collaborative project between the City of Helsinki and HUS, implemented using an alliance model.
-
Espoo City Rail
We are responsible for railway planning and geotechnical engineering as a subconsultant to Proxion of the Tuomarila—Kauklahti section.
-
Kuopio University Hospital’s New Heart project (part of hospital reforms), Kuopio
The Kuopio university hospital reform project, New Heart, encompasses the renovation of Puijo Hospital’s inpatient wards and the construction of a new nine-storey hospital building between 2018 and 2027.
-
Hailuoto causeway and bridges, Oulu
The new over 8 kilometer long fixed connection will link Oulu and the largest island in the Bay of Bothnia, Hailuoto, via an embankment road and two bridges.