Tärttämäki Bridge, Äänekoski
The bridge will offer excellent transport connections to serve the increasing traffic volumes across the whole of Central Finland, while ensuring the smooth running of transport operations to the Äänekoski bioproduct plant.

Design challenges were presented by factors such as the strait’s steep banks and rocky surfaces, which created varied ground conditions. The bridge has intermediate supports, which are supported by drill piles resting on the underwater rock base. The land supports were built on filled land banks. Because the bridge deck is relatively wide, the tensioned concrete deck structure has a three-beam design.
Customer
Väylävirasto
Location
Äänekoski
Size
200 m
Completion
2019
Services
Bridges and engineering structures
Geotechnical engineering
-
Espoon kaupunkirata, Espoo
Espoon kaupunkiradan osuuden Tuomarila–Kauklahti rakentamissuunnittelu.
-
KYS Uusi Sydän, sairaalan uudistushanke, Kuopio
Kuopion yliopistollisen sairaalan KYS Uusi sydän -uudistushanke kattaa Puijon sairaalan vuodeosastotornin peruskorjauksen sekä uuden kymmenkerroksisen tornisairaalan rakentamisen vuosina 2018-2027.
-
Hailuodon kiinteä yhteys, Oulu
Uusi 8,4 kilometriä pitkä kiinteä yhteys yhdistää Oulun ja Perämeren suurimman saaren, Hailuodon, pengertiellä ja kahdella sillalla.
-
Aurinko- ja tuulivoimapuisto, Kauhajoki
Kauhajoelle suunnitellaan merkittävän kokoista aurinko- ja tuulivoimapuistoa.