Skip to content

Rastaala school, Espoo

Rastaala Primary School building completed in 1956 was renovated as it was suffering from a mold problem, bringing it up to modern standards in both requirements for effective teaching and interior air quality.

Rastaala school, Espoo

The entire interior was renovated; all surfaces were fixed and painted and completely new furnishings were acquired. Additionally, the ventilation was enhanced and improved, electrical output modernised, new lighting installed, IT- and communications lines were installed in every room, and they were equipped with new updated fire alarm systems. The interior surface materials, furnishings, fabrics, lighting and color scheme were chosen with respect to the buildings original style. Linoleum floors, lighting opals, wood furniture, and tamed colors Encapsulated the 1950s, and for example plastered acoustic material was used for sound proofing so that the classrooms look stayed true to their original spirit. ONE Architects (Part of AINS Group) were responsible for the main, architectural and interior design of the project: https://www.onearchitects.fi/ Photos: Tuomas Uusheimo

Customer
Espoon kaupunki

Location
Espoo

Size
2130 brm2

Completion
2019

Services
Principal and architectural design
Interior design

Other references

  • Laakso Joint Hospital, Helsinki

    Laakso Joint Hospital, Helsinki

    Laakso Joint Hospital is a collaborative project between the City of Helsinki and HUS, implemented using an alliance model.

  • riiimäen voimala ilmakuva riihimäen kaupunki

    Riihimäki power plant, Riihimäki

    The Riihimäki power plant, located in the immediate vicinity of the Riihimäki railway station, is a former power plant building and a landmark for which the city has been looking for a new use.

  • Rovaniemen-kaupungintalo---Jari-Sievälä,-Vastavalo-16-9-pie

    Rovaniemi City Hall, Rovaniemi

    The Rovaniemi City Hall, designed based on the sketches of architect Alvar Aalto and completed in 1986, is undergoing extensive renovations, including the renewal of ventilation, heating, and cooling systems.

  • Tampere Central Office Building, Tampere

    Tampere Central Office Building, Tampere

    In the renovation and expansion of the Tampere Central Office Building, designed by Aarne Ervi and built in 1968, the prefabricated façade elements will be replaced by removing all external cladding and insulation, following the principles of restorative repair.