Luumäki-Imatra double-track railway
The part of the Karelian Railway running between Joutseno and Imatra is undergoing work in preparation for the construction of a double-track section as part of the Luumäki–Imatra railway project.

The goal is to increase goods cargo capacity and reduce the number of disruptions in rail transport. To enable the construction of the 19-kilometre double-track section, the current track must be improved and a new track must be built next to it, in addition to 12 bridges. On the section running between Luumäki and Joutseno, the flow of rail traffic will be made more efficient through improvements, which include changes to the railway yards and the extension of passing loops.
Customer
Väylävirasto
Location
Imatra
Size
19 km
Completion
2023
Services
Railway planning
Bridges and engineering structures
-
Espoon kaupunkirata, Espoo
Espoon kaupunkiradan osuuden Tuomarila–Kauklahti rakentamissuunnittelu.
-
KYS Uusi Sydän, sairaalan uudistushanke, Kuopio
Kuopion yliopistollisen sairaalan KYS Uusi sydän -uudistushanke kattaa Puijon sairaalan vuodeosastotornin peruskorjauksen sekä uuden kymmenkerroksisen tornisairaalan rakentamisen vuosina 2018-2027.
-
Hailuodon kiinteä yhteys, Oulu
Uusi 8,4 kilometriä pitkä kiinteä yhteys yhdistää Oulun ja Perämeren suurimman saaren, Hailuodon, pengertiellä ja kahdella sillalla.
-
Aurinko- ja tuulivoimapuisto, Kauhajoki
Kauhajoelle suunnitellaan merkittävän kokoista aurinko- ja tuulivoimapuistoa.