Kirstinpuisto city plan, Turku
The project included street and street construction plans for the Kirstinpuisto area, as well as municipal engineering construction plans.

In addition, the work included park and building plans, lighting design, design of technical structures, stormwater management design, and design of the area's ground reinforcements, traffic light design, and coordination and coordination between different areas regarding line and equipment design (operators, electricity, district heating). Kirstinpuisto is located approximately 1.5 km from the Market Square. The aim of the local plan amendment is to develop the old industrial area into a city center-like, diverse and comfortable residential area that relies on public transport and high-quality walking and cycling connections. The planning of the area emphasized solutions in line with sustainable development and high-quality public spaces and green areas. A unified, partly delay-based above-ground stormwater system was prepared for the entire plan area.
Customer
City of Turku
Location
Turku
Completion
2020
Services
Traffic planning
Bridges and engineering structures
Street and curtilage planning for real estate
-
Espoon kaupunkirata, Espoo
Espoon kaupunkiradan osuuden Tuomarila–Kauklahti rakentamissuunnittelu.
-
KYS Uusi Sydän, sairaalan uudistushanke, Kuopio
Kuopion yliopistollisen sairaalan KYS Uusi sydän -uudistushanke kattaa Puijon sairaalan vuodeosastotornin peruskorjauksen sekä uuden kymmenkerroksisen tornisairaalan rakentamisen vuosina 2018-2027.
-
Hailuodon kiinteä yhteys, Oulu
Uusi 8,4 kilometriä pitkä kiinteä yhteys yhdistää Oulun ja Perämeren suurimman saaren, Hailuodon, pengertiellä ja kahdella sillalla.
-
Aurinko- ja tuulivoimapuisto, Kauhajoki
Kauhajoelle suunnitellaan merkittävän kokoista aurinko- ja tuulivoimapuistoa.