Helsinki-Vantaa airport extension, Vantaa

As part of the Helsinki Airport upgrade and extension programme, Terminal 2 was extended to meet the demands of a growing number of passengers.

Helsinki-Vantaa airport extension, Vantaa

Users are now benefitting from more straightforward connections between the terminal, train station and a new car park. AINS Group was responsible for the project’s rock engineering and product component design for the timber ceiling contractor. The improved connection between Terminal 2 and the train station required rock excavations in the immediate vicinity of the fully operational train line and airport. AINS Group was responsible for the excavation of 35,000 cubic metres of rock as well as rock structure engineering. Due to the spatial organisation, the excavation of the shaft was carried out top-down, which is exceptional. Following the excavation of the 30-metre shaft, a tunnel was created between the train station and the airport concourse, and a bridge across the continuously operational train line was built. The upgrade and extension of T2 were part of Finavia’s EUR 1 billion-plus development programme for Helsinki Airport. The excavation and construction project started in 2014 and will be completed in 2023.

Customer
Finavia

Location
Vantaa

Completion
2023

Services
Rock engineering

Other references

  • The development project of the Vuokatti slope area aims to become one of Finland's leading tourist centres. AINS Project Development was responsible for managing the planning of the project using the Onesite city model

    Vuokatti slope area, Sotkamo

    The purpose of the Vuokatti 2040 development project is to create a vision and an area plan for the slope areas of Vuokatti, which will diversify the region's tourism services and strengthen its position as one of Finland's leading tourist centres.

  • TAYS_M-rakennus_tyoyhteenliittyma ManU 1920 X 1080

    Tays M-building, Tampere

    The upcoming M‑building at Tays, part of the hospital’s acute care hospital operations, will utilise an extensive energy‑recovery system in which heat captured from cooling processes is efficiently reused.

  • Oulu University Future Hospital 2030, Oulu

    In the OYS University Hospital's reform program at OYS2030, the hospital's operations and facilities will be renovated to meet the challenges of future specialised healthcare.

  • Laakso Joint Hospital, Helsinki

    Laakso Joint Hospital, Helsinki

    Laakso Joint Hospital is a collaborative project between the City of Helsinki and HUS, implemented using an alliance model.