Helsinki’s Music Centre presented a unique and challenging project, even on a global level, and it required bold and skilled management operations.

Music Centre, Helsinki

The building is varied in terms of its architecture, and data modelling was utilised comprehensively in its design, such as in the merging of various plans, simulations and the illustration of the design to the builders. The Music Centre is Finland’s first building on this scale to utilise data modelling.

Customer
Helsingin kaupunki

Location
Helsinki

Size
38 500 m²

Completion
2011

Services
Project and construction management
Project management and construction (PMC)

  • Vuokatin rinnealueen kehittämishankkeella tavoitellaan asemaa yhtenä Suomen johtavista matkailukeskuksista. AINS Hankekehitys vastasi hankkeen suunnittelun johtamisesta Onesite-kaupunkimallin avulla

    Vuokatin rinnealueen kehittämishanke, Sotkamo

    Vuokatti 2040- kehittämishankkeen tarkoituksena on luoda Vuokatin rinnealueille visio ja aluesuunnitelma, joka monipuolistaa alueen matkailupalveluja ja vahvistaa asemaa yhtenä Suomen johtavista matkailukeskuksista.

  • OYS 2030 - Tulevaisuuden sairaala, Oulu

    Oulun yliopistollisen sairaalan uudistamisohjelmassa OYS2030:ssa sairaalan toiminta ja tilat uudistetaan vastaamaan tulevaisuuden erikoissairaanhoidon haasteisiin.

  • Laakson yhteissairaala, Helsinki

    Laakson yhteissairaala, Helsinki

    Laakson yhteissairaala on Helsingin kaupungin ja HUS:n allianssimallilla toteuttama yhteishanke, joka valmistuessaan on yksi Suomen suurimmista sairaaloista.

  • Keilaniemi-aukionäkymä_web

    Keilaniemi Tower, Espoo

    Espoon Keilaniemeen nousee korkea hybriditalo, jossa on 34 maanpäällistä kerrosta ja neljä maanalaista kellarikerrosta.