Skip to content

Hervannan Simeoni, housing company, Tampere

The residential block was completed in 1995.

Hervannan Simeoni, housing company, Tampere

The exposed aggregate exterior cladding was pressure-washed and the elastic joints were repointed. The balcony glazing was replaced, and the balconies were reconditioned. Door and window structures were repainted. AINS Group was responsible for the planning, contracting and management of the renovation project.

Location
Tampere

Completion
2017

Services
Supervision
Infill construction
Renovation engineering of heritage buildings

Other references

  • Laakso Joint Hospital, Helsinki

    Laakso Joint Hospital, Helsinki

    Laakso Joint Hospital is a collaborative project between the City of Helsinki and HUS, implemented using an alliance model.

  • riiimäen voimala ilmakuva riihimäen kaupunki

    Riihimäki power plant, Riihimäki

    The Riihimäki power plant, located in the immediate vicinity of the Riihimäki railway station, is a former power plant building and a landmark for which the city has been looking for a new use.

  • Rovaniemen-kaupungintalo---Jari-Sievälä,-Vastavalo-16-9-pie

    Rovaniemi City Hall, Rovaniemi

    The Rovaniemi City Hall, designed based on the sketches of architect Alvar Aalto and completed in 1986, is undergoing extensive renovations, including the renewal of ventilation, heating, and cooling systems.

  • Tampere Central Office Building, Tampere

    Tampere Central Office Building, Tampere

    In the renovation and expansion of the Tampere Central Office Building, designed by Aarne Ervi and built in 1968, the prefabricated façade elements will be replaced by removing all external cladding and insulation, following the principles of restorative repair.