D building, Tampere University Hospital renovation project 2020, Tampere
Tampere University Hospital’s new D building houses a new interventional radiology unit, which will bring expertise in vascular surgery and interventional radiology under one roof.
Using the latest technology, interventional radiologists can perform minimally invasive image-guided procedures, avoiding the need for invasive surgery. The D building will also house maternity and neonatal wards. In addition, the outpatient clinic, ward, and operating theatres for musculoskeletal diseases will be located in this building. The hospital’s new main lobby too will be in the building.
Customer
Pirkanmaan sairaanhoitopiiri
Location
Tampere
Size
37 000 brm²
Completion
2019
Services
HVAC and building automation
Structural engineering
Acoustical engineering
Electrical engineering
Other references
-
Vuokatti slope area, Sotkamo
The purpose of the Vuokatti 2040 development project is to create a vision and an area plan for the slope areas of Vuokatti, which will diversify the region's tourism services and strengthen its position as one of Finland's leading tourist centres.
-
Tays M-building, Tampere
The upcoming M‑building at Tays, part of the hospital’s acute care hospital operations, will utilise an extensive energy‑recovery system in which heat captured from cooling processes is efficiently reused.
-
Oulu University Future Hospital 2030, Oulu
In the OYS University Hospital's reform program at OYS2030, the hospital's operations and facilities will be renovated to meet the challenges of future specialised healthcare.
-
Laakso Joint Hospital, Helsinki
Laakso Joint Hospital is a collaborative project between the City of Helsinki and HUS, implemented using an alliance model.