Kavolinhaka, housing company, Nokia
The building was completed in 1971.

The extensive renovation involved the replacement of nearly all balcony structures, and new insulation and thin-coat plastering were added to the facades. The chimney was dismantled and the stairwells were made accessible. The project benefited from innovative and ambitious solutions: the old flat roof was converted into a slightly slanted roof with added eaves. AINS Group was involved in the building survey, project planning, renovation planning (architectural and structural design), and contracting and supervision.
Location
Nokia
Completion
2018
Services
Project planning
Supervision
-
OYS 2030 - Tulevaisuuden sairaala, Oulu
Oulun yliopistollisen sairaalan uudistamisohjelmassa OYS2030:ssa sairaalan toiminta ja tilat uudistetaan vastaamaan tulevaisuuden erikoissairaanhoidon haasteisiin.
-
Laakson yhteissairaala, Helsinki
Laakson yhteissairaala on Helsingin kaupungin ja HUS:n allianssimallilla toteuttama yhteishanke, joka valmistuessaan on yksi Suomen suurimmista sairaaloista.
-
Riihimäen voimala
Riihimäen rautatieaseman välittömässä läheisyydessä sijaitseva Riihimäen voimala on entinen voimalaitosrakennus ja maamerkki, jolle kaupunki on etsinyt uutta käyttöä.
-
KYS Uusi Sydän, sairaalan uudistushanke, Kuopio
Kuopion yliopistollisen sairaalan KYS Uusi sydän -uudistushanke kattaa Puijon sairaalan vuodeosastotornin peruskorjauksen sekä uuden kymmenkerroksisen tornisairaalan rakentamisen vuosina 2018-2027.