Amusement park equipment Boom, Särkänniemi, Tampere

Amusement park equipment Boom, Särkänniemi, Tampere

The new Särkänniemi amusement park equipment for summer 2019, Boom, will lift passengers with a 4G acceleration force to 68 meters on a mast structure rotating around its axis. The foundation, which is hidden at a depth of six meters on the ground, is a particularly demanding concrete structure that, together with the base bolt circumference, holds the new equipment safely in place. The new equipment of the Italian equipment manufacturer Zamperla is a visible element in Tampere's cityscape. However, the noise nuisance from the device is not carried to the city, as the minimization of noise nuisance has been ensured by calculations by acoustic designers.

Location

Tampere

Client

Tampereen Särkänniemi Oy

Services

Project and construction management, Supervision services, Acoustical design, Architectural and principal design , Foundation engineering

Cost

3.3 M€

Completion

2019

Our other references

Lempäälä underground swimming pool

Lempäälä underground swimming pool

TYS Tyyssija, Turku

TYS Tyyssija, Turku

Matinkylä indoor swimming pool, Espoo

Matinkylä indoor swimming pool, Espoo

Saimaa Stadium, Mikkeli

Saimaa Stadium, Mikkeli

Samppalinna Outdoor Swimming Stadium, Turku

Samppalinna Outdoor Swimming Stadium, Turku

Solvalla Sports Arena, Espoo

Solvalla Sports Arena, Espoo